Design, Techology & Construction
| EVENTS |
|
10 August 2006 OTS submits first patent request for the Benelux countries 20 March 2008 Strukton Groep from the Netherlands signs licensing agreement for application of the OTS system in the Benelux. 16 August 2008 OTS submits definitive patent registration for the OTS system; global patents pending. 9-13 November 2008 OTS participates in Russia Business Mission with Mr. Eurlings, Dutch Minister of Transportation & Infrastructure 23 April 2009 OTS to launch OTS movie 26-28 April 2009 OTS will participate as Lunch Sponsor in the IQPC Urban Transportation Summit 2009 in Abu Dhabi. |
![]() |
A minimum distance between cabins is secured using radar control units. Cabins can never collide due to a combination of safety features.
Upon approach of stations and switch points, cabins are decelerated recovering the brake energy.
All cabins are operated individually and on-demand using a state-of-the-art dynamic traffic management control system. The maximum transportation capacity per single track is 2 cabins per minute or 4800 people per hour.
- Inspiration
- Train Track Tunnel
- Track Design
- Bogies & Passenger Cabins
- Traffic Control & Transportation Capacity
- Safety
- Production & Construction
| OTS MOVIE | MORE INFORMATION | |
|
||
![]() |
![]() |


