10 August 2006 OTS submits first patent request for the Benelux countries 20 March 2008 Strukton Groep from the Netherlands signs licensing agreement for application of the OTS system in the Benelux. 16 August 2008 OTS submits definitive patent registration for the OTS system; global patents pending. 9-13 November 2008 OTS participates in Russia Business Mission with Mr. Eurlings, Dutch Minister of Transportation & Infrastructure 23 April 2009 OTS to launch OTS movie 26-28 April 2009 OTS will participate as Lunch Sponsor in the IQPC Urban Transportation Summit 2009 in Abu Dhabi. |
![]() |
The bogie tunnel is supported by a construction of steel bows which are mounted on rigid concrete platforms. The distance between the supporting columns is 60 meters. If larger crossover distances are required, alternate carrying systems can be selected similar to crossover bows used in larger bridges.
In order to allow for necessary clearance, the bottom of the carrying construction is positioned at 8.0 meters above ground level. The height can be easily adapted to different surface conditions for instance to facilitate crossing of waterways or obstacles where little clearance is required.
Separate track sidelines at stations keep the mainline available for high-speed through travel, if needed. Platforms can be kept short and cost effective due to the high frequency of arriving and departing passenger cabins.
- Inspiration
- Train Track Tunnel
- Track Design
- Bogies & Passenger Cabins
- Traffic Control & Transportation Capacity
- Safety
- Production & Construction